86: Ham Hill Waste Water Treatment Works

1) Name 2 places for which Ham Hill treats waste water:

________________________

________________________

2) How does waste water get to Ham Hill?

____________________________________________________

Preliminary treatment

3) What is the first treatment that waste water goes through?

____________________________________________________

4) How big are the screen holes?

____________________________________________________

5) What is removed?

____________________________________________________

6) What is the site's name for this solid stuff?

____________________________________________________

7) What happens to the solid stuff in the liceps?

____________________________________________________

8) Where is the solid stuff taken eventually?

____________________________________________________

9) Where does the waste water go next?

____________________________________________________

10) What happens to the waste water in these channels?

____________________________________________________

 

Primary tanks

11) How does the water get from the grit removal channels to the primary tanks?

____________________________________________________

12) How many primary tanks are there?

____________________________________________________

13) How many primary tanks are normally used?

____________________________________________________

14) When are all the tanks sometimes used?

____________________________________________________

15) How long does the water stay in the primary tanks?

____________________________________________________

16) What happens to the inorganic material in the primary tanks?

____________________________________________________

17) What do the half bridge scrapers do?

____________________________________________________

Biological treatment

18) How many activated sludge lanes are there?

____________________________________________________

19) What do the diffusers pump into the lanes?

____________________________________________________

20) Why is this gas needed?

____________________________________________________

21) What do bacteria do in these lanes?

____________________________________________________

22) How many zones are there in each lane?

____________________________________________________

23) Why is some activated sludge removed from the system?

____________________________________________________

Final settlement tanks

24) What is the effluent?

____________________________________________________

25) What happens to the activated sludge and effluent in the final settlement tanks?

____________________________________________________

26) Which river is it discharged to?

____________________________________________________

27) Who checks that the effluent going back to the river meets the correct standards?

____________________________________________________

Sludge

28) Where is the sludge taken to when it leaves the primary tanks?

____________________________________________________

29) What happens to the solids?

____________________________________________________

30) How long does the sludge stay here?

____________________________________________________

31) What temperature is this place?

____________________________________________________

32) Why does this place need to be warm?

____________________________________________________

33) What is produced as a byproduct?

____________________________________________________

34) What is this gas used for?

____________________________________________________

35) Where does the digested sludge go next?

____________________________________________________

36) What happens to the sludge in the press building?

____________________________________________________

37) What is de-watering?

____________________________________________________

38) What is the sludge used for after treatment?

____________________________________________________

39) As you walk round the site draw pictures of the following things:

INLET SCREEN

LICEPS TO CLEAN SCREENINGS

GRIT REMOVAL CHANNELS

PRIMARY TANKS

ACTIVATED SLUDGE LANES

FINAL SETTLEMENT TANKS

PRIMARY DIGESTER

SECONDARY DIGESTER

PRESS BUILDING

 

Worksheets menuNext sheet